Customer: Mondi SCP, a.s. Ružomberok
Realization: 07/2017 - 09/2017
Place: Ružomberok paper-mill, Slovak Republic
Order: Replacement of a debarking drum
Characteristics of the order: Operation of heavy mobile cranes (220 t)
Parameters: Grove GMK 5220

Customer: ALIACEM a.s.
Realization: 09/2016 - 03/2017
Place: Mannerzdorf cement plant, Austria
Order: Complete reconstruction of the cement plant exchanger
Characteristics of the order: Operation of heavy mobile cranes (400 t)
Parameters: GROVE GMK 6400, parts of an exchanger 23 t, 36 m radius, 96 m height

Customer: GIGA montáže, s.r.o.
Realization: 02/2017
Place: NYPRO Přerov, Czech Republic
Order: Installation of an overhead crane
Characteristics of the order: Operation of heavy mobile cranes (100 t)
Parameters: GROVE GMK 4100 S, parts of an overhead crane 18 t, 13 m radius, 12 m height, a confined space

Customer: Českomoravský cement, a.s.
Realization: 01/2017 - 01/2017
Place: Radotín cement plant, Czech Republic
Order: Replacement of a kiln part
Characteristics of the order: Operation of heavy mobile cranes (100 t)
Parameters: GROVE GMK 4100, parts of a kiln 13 t, 8 m radius, 12 m height, a confined space

Customer: HOLCIM, a.s., Rohožník cement plant, Slovak Republic
Realization: 04/2016
Place: MZP Přerov facility
Order: Loading of a rotary kiln shell
Characteristics of the order: Operation of heavy mobile cranes (55 t)
Parameters: TEREX AC 55 in the front, a rotary kiln shell 58 t, 12 m radius, 8 m height, coordination of three cranes

Customer: Montáže Milis
Realization: 10/2015
Place: ČEZ Prosenice
Order: Installation of a transformer
Characteristics of the order: Operation of heavy mobile cranes (220 t)
Parameters: GROVE GMK 5220, a transformer 42 t, 12 m radius, 16 m height

Customer: Carriere Lotode
Realization: 09/2014 - 05/2015
Place: Grand Champ, France
Order: Quarry hoppers installation with crane Liebherr LTM 1040 a LTM 1025

Customer: OHL ŽS Brno
Realization: 04/2015
Place: Přerov heating plant
Order: Installation of a driving shield
Characteristics of the order: Operation of heavy mobile cranes (220 t)
Parameters: GROVE GMK 5220, a driving shield 45 t, 10 m radius, 6 m height, mounting of the driving shield

Customer: Firesta a.s.
Realization: 04/2015
Place: Tennis footbridge - Přerov, Czech Republic
Order: Installation of footbridge by Tennis over the Bečva River, cranes Liebherr LTM 1300 and Grove GMK 5220

Customer: Metso Minerals
Realization: 09/2014 - 03/2015
Place: Steinskogen, Norway
Order: Quarry crushing and screening plant installation with Terex AC 55L crane

Customer: Mostostal Zabrze S.A.
Realization: 2015
Place: Třinecké Železárny a.s., Czech Republic
Order: Dedusting silo disassembly with Liebherr LTM 1300 crane

Customer: Montáže Trenčín a.s.
Realization: 06/2014 - 12/2014
Place: Senica, Slovakia
Order: Silo for sand processing plant installation with cranes Grove GMK 5220 an Terex AC 55L

Customer: PSG International
Realization: 05/2014 - 11/2014
Place: Heating station C Energy Bohemia - Planá nad Lužnicí, Czech Republic
Order: Heat station chimney installation with crane Demag TC 1200; Furnace disassembly and installation with crane Liebherr LTM 1300; Installation of filter with crane Grove GMK 5220

Customer: Kotlárny Vlček a.s.
Realization: 09/2014
Place: Deza Valašské Meziříčí, Czech Republic
Order: Furnace transport and installation with crane Liebherr LTM 1160

Customer: Montáže Trenčín a.s.
Realization: 08/2014
Place: Sugar plant Agrana SK - Sereď, Slovakia
Order: Press installation with crane Grove GMK 5220

Customer: Mondi SCP, a.s. Ružomberok
Realization: 03/2014
Place: Ružomberok paper-mill, Slovak Republic
Order: Installation of a rotary kiln
Characteristics of the order: Operation of heavy mobile cranes (220 t)
Parameters: GROVE GMK 5220, parts of a rotary kiln 65 t, 16 m radius, 16 m height, coordination of two cranes

Customer: Heidelberg
Realization: 2014
Place: Degerhamn, Sweden
Order: Installation of the Filter

Customer: Mondi SCP a.s., Ružomberok
Realization: 2014
Place: Ružomberok, Slovak Republic
Order: Installation of a lime rotary kiln

Customer: Precheza a.s.
Realization: 2013
Place: Přerov, Czech Republic
Order: Transportation of an absorption tower

Realization: 2012
Place: Neau, France
Order: Installation of a cement plant technological equipment

Customer: Precheza a.s.
Realization: 2012
Place: Přerov, Czech Republic
Order: Installation of a chimney

Realization: 2010
Place: Zlín, Czech Republic
Order: Installation of a trafostation

Customer: MILO Olomouc
Realization: 2010
Place: Olomouc, Czech Republic
Order: Installation of a kiln of 160 t weight

Realization: 2008
Place: Náklo u Olomouce, Czech Republic
Order: Moving a ship of 65 t weight

Customer: Hyundai
Realization: 2007
Place: Nošovice, Czech Republic
Order: Erection of a forging shop building

Customer: Mondi SCP a.s., Ružomberok
Realization: 2006
Place: Ružomberok, Slovak Republic
Order: Loading a dryer for Mondi Ružomberok

Customer: Sugar plant
Realization: 2005
Place: Němčice na Hané, Czech Republic
Order: Disassembly of a lime plant

Realization: 2004
Place: Trenčianská Teplá, Slovak Republic
Order: Installation of a sugar plant evaporator

Customer: Kaufland
Realization: 2004
Place: Olomouc, Czech Republic
Order: Installation of coolers

Customer: Východoslovenské stavebné hmoty, a. s.
Realization: 2004
Place: Turňa nad Bodvou, Slovak Republic
Order: Installation of clinker silos in the Turňa nad Bodvou cement plant

Customer: SAZKA, a.s.
Realization: 2003
Place: Prague, Czech Republic
Order: Assembling works for the Sazka Arena erection

Customer: Railway Infrastructure Administration
Realization: 2003
Place: Česká Třebová, Czech Republic
Order: Erection of a railway bridge

Customer: Comsat, global telecommunications company
Realization: 1992
Place: Sedlec - Prčice, Czech Republic
Order: Installation of satellite antennas for a satellite communications centre

Customer: Havířov - Suchá power station
Realization: 1976
Place: Czech Republic
Order: Replacement of a stack of no.4 boiler

Customer: All Sports Stadium in Hradec Králové
Realization: 1976
Place: Czech Republic
Order: Installation of floodlighting towers (lollipops) in the All Sports Stadium

News

Expansion of our machine fleet by GROVE GMK 6400 and GROVE GMK 4100S mobile cranes

In November 2016 Montáže Přerov company added two new mobile cranes to the existing machine fleet. ...
Read more »


Contacts

Montáže Přerov a. s.
9. května 3303/119
750 02 Přerov

Cranes and Transport:
Matěj Horký
+420 581 267 423
+420 724 080 666
horky@montaze.cz Member of MZP Group

More Contacts »


MZP GROUP
Thámova 137/16
186 00 Praha 8 - Karlín

+420 225 379 020
+420 725 935 903